The third phase of a long range master plan, completed by Ratcliff in 2010, includes renovation of an existing two story classroom wing and the incorporation of a new lobby element and administration spaces. The new design will enhance the overall entry and appearance of the school. The classroom wing layout will be updated to incorporate new building systems and respond to new teaching methods creating spaces and the use of furniture for greater flexibility. The new curved lobby feature expands the circulation spaces to allow for greater activity and connection to other program elements such as the theater and the student center.
The third phase of a long range master plan, completed by Ratcliff in 2010, includes renovation of an existing two story classroom wing and the incorporation of a new lobby element and administration spaces. The new design will enhance the overall entry and appearance of the school. The classroom wing layout will be updated to incorporate new building systems and respond to new teaching methods creating spaces and the use of furniture for greater flexibility. The new curved lobby feature expands the circulation spaces to allow for greater activity and connection to other program elements such as the theater and the student center.